top of page
A Great Reference
The foundation of the ceiling
Alternate View
The ceiling box beams are completed
The finished product

The kitchen is complete. The closet next to the Refrigerator alcove was removed, the doorway was widened, and the cabinets were removed and replaced.

Pre-construction view of the kitchen

The refrigerator alcove location was not changed during the remodel.

A clean cooking area

The microwave was replaced with an exhaust fan and the stove top location was moved slightly to accommodate the new cabinet.

Pre-construction view 2

Golden Oak forever!

A second look at the stove-top
China cabinet wall P1

The base cabinets were set and the butcher block top is scribed to fit and set.

China cabinet P2

The upper cabinets are set.

China cabinet 3

The doors are installed and the crown molding was installed

China cabinet

A job well done!

bottom of page